Email Print

Losseal Lost Circulation Treatment

Overview Library

Mitigate the risk of lost circulation while drilling

An innovative blend of fibers and sized solids, the Losseal engineered pill bridges thief zones that can lead to lost circulation while drilling and cementing. It is suitable for a wide range of environments, including natural fractures, dolomite and carbonate zones, rubble zones, depleted reservoirs, and reservoirs with known lost circulation problems. The Losseal system can even be pumped through BHA nozzles as small as 10/32 in—eliminating the need to pull out of hole.

Create an impermeable grid against losses

The Losseal system creates a strong, impermeable grid that stops mud from flowing into high-permeability zones. It is designed to withstand additional pressure from mud density increases, and any future drilling or cementing operations. The treatment saves thousands of barrels of fluid during placement and reduces NPT caused by lost circulation.

Seal off thief zones—without detailed measurements

Traditional lost circulation materials are often based on a fixed fracture width. The Losseal fiber pill is much less sensitive to fracture sizes and can be applied without detailed formation measurements.

Request More Information

Engineered Lost Circulation Material Cures 2,000-bbl Mud Loss in Carbonate Reservoir

Chart of lost circulation treatment results
Losseal pill helped a South American operator cure mud losses of 2,000 bbl, drill to TD and cement without further losses or an extra trip. Read case study

Engineered Lost Circulation Material Cures Thief Zones

Losseal Lost Circulation Treatment System
PrevNextZoom1 of 1