Case Study Frac Flowback Campaign Boosts Production by 3,000 bbl/d
Integrated stimulation and solids handling services remove 13,500-kg solids, eliminate 6,700-t CO2e
Measure to improve field productivity
Flowback is necessary for initial well cleanup, to remove fluids that were introduced to the well and any debris that accumulated in the wellbore. The produced fluids are collected for recycling or disposal.
But beyond this necessary task, once the well has been cleaned up, well testing can be conducted. The choke pressure is managed to flow the wellstream of reservoir fluid, typically to a three-phase separator to measure the flow rate of each component: gas, oil, and produced water.
Well testing enables making key production measurements such as flow rate, fluid properties and composition, pressure, and temperature at live well conditions. From this basis you can better understand downhole conditions to
You can rely on our production testing expertise for leveraging your well test to identify improvements, increase efficiency, and focus your field investment.