Case Study Coiled Tubing Interventions in Five Wells Boost Geothermal Power Production by 14 MW
Integrated strategy enabled liquid unloading and scale removal, eliminating need for makeup wells.
Extend the life of your geothermal wells
Geothermal fields can have long lifespans, with some operating for more than 50 years. Over time, they undergo changes in operating conditions and integrity due to fluid chemistry, pressure, enthalpy, degrading cement conditions, and other factors that may cause costs to escalate or production to decline. In response, well interventions are crucial for your geothermal field to maximize well production while maintaining the integrity of your wells.
At SLB, we harness our deep domain expertise, technology resources, and digital workflows to deliver holistic geothermal well intervention solutions to enhance production, safeguard well integrity, and boost well longevity.
Geothermal Webinar Series
Hear directly from our experts about solutions that optimize your geothermal project.
Explore all webinarsJoin Nigel Yong, Asia coiled tubing domain associate, as he discusses overcoming challenges in geothermal wells using coiled tubing operations. Learn how advanced strategies and meticulous planning led to successful output restoration, cost savings, and project success.
Wednesday, 14 May 2025
06:00 PM
CST
Illuminating the reservoir with detailed understanding
Trust your geothermal project to leading software and expertise
Improve geothermal drilling with solutions that perform in hard rock and high temperatures
Connecting to the geothermal resource
Optimize performance for the long term