Tech Report First 24-Hour HPHT Inflow Test Succeeds Without Applying Full Workstring Load to Liner Top
Application-specific WELL COMMISSIONER tool meets stringent Inflow test criteria.
Liner top test tool
Operators are challenged to identify tools that are the most effective for performing necessary tasks in the least amount of time. Critical operations, such as cleanup after cementing a liner while ensuring well integrity, contribute to the success of a well. The WELL COMMISSIONER liner-top test tool saves rig time by performing negative inflow tests on the same trip as the wellbore displacement. It is possible to cleanout to cased hold TD and perform negative test from the production liner top to the liner shoe in a single trip.
M-I SWACO engineers review each well's conditions when implementing the WELL COMMISSIONER tool. Drilling and milling operations can be performed with the tool in the string.