Fullbore Completion Tubing Equipment (FBCTE) | SLB

Fullbore Completion Tubing Equipment (FBCTE)

Hydraulic fracturing tubing spool provides fullbore access

Texture Rotating Blue

Hydraulic fracturing tubing spool provides fullbore access

Fully rated tubing spools provide an alternative to the use of bore isolation tools. When fullbore access is required, we can provide a fullbore extension of the standard completion tubing equipment (SCTE). The Cameron FBCTE is a hydraulic fracturing tubing spool that contains a set of Type E lockscrew assemblies to provide the initial landing shoulder and retain the tubing hanger.

Cost-effective design enables use of smaller trees

The FBCTE allows use of small-bore valves during fracturing and flowback operations, reducing cost and height and facilitating handling. It is available in 4 1/16- and 5 1/8-in nominal sizes up to 15,000-psi working pressure, with full opening to both 4 1/2- and 5 1/2-in casing.

Transition from fracturing and flowback to production mode without killing the well

The FBCTE has the ability to set a 5-in backpressure valve (BPV) that provides a barrier during the transition from fracturing to production without having to replace the frac tree with a production tree and change the spool.

Frac Flowback Equipment
Subscribe