A mature field in Oklahoma, produces natural gas from a Pennsylvanian sandstone reservoir. The pay sand is separated by a thin, hard Ordovician bromide carbonate (100 ft and 35,000-psi unconfined compressive strength) and a hydrated shale. With little success, an operator attempted to drill horizontal prospects in this field with a variety of polycrystalline diamond compact (PDC), impregnated, and tungsten carbide insert (TCI) drill bits.
Because of escalating natural gas prices though, the operator reevaluated the economics of drilling extended-reach horizontal wells in the field and sought a solution to maximize production. The operator wanted to efficiently drill within the nonproductive Ordovician layer, land wells horizontally in the carbonate, and extend horizontal wellbore reach to the maximum before employing a directed openhole fracture treatment—all without touching the lower hydrated shell.
SLB tested Neyrfor™ turbodrilling systems BHA against conventional turbodrill BHA using two trial wells. We drilled 15,050 ft MWD for both trial wells, using just three drill bits for the Neyrfor well compared with five for the conventional well. We implemented strategy for four more wells, saving 57½ drilling days and USD 1.2 million.
Based on offset well data from a nearby county that revealed the bromide's lateral continuity and homogeneity, the operator decided to perform a trial of the Neyrfor turbodrill with a Kinetic diamond impregnated drill bit. Neyrfor turbodrills combine a turbine power section with a directional bearing section for higher mechanical hp, higher rpm, more uniform torque, and more directional control when compared with conventional positive displacement motors (PDMs). Neyrfor turbodrills also improve wellbore quality while reducing downhole drilling shock and vibration.
The first trial well was run out of a 7-in liner, with the BHA comprising a Neyrfor turbodrill, a Kinetic impregnated drill bit and M/LWD systems. A second trial well was drilled thereafter to test the Neyrfor turbodrill against a BHA comprising a conventional turbodrill, an alternative impregnated drill bit, and a conventional PDM drive system.
Using the Neyrfor turbodrill BHA, the operator built the first trial well from 70 to 90° before landing the wellbore horizontally at a TD of 15,050-ft MD—with only three drill bits required.
The second trial well, however, saw immediate complications after only 130 ft when the alternative impregnated bit stopped drilling. The conventional BHA suffered catastrophic failure after making just 16 ft of hole with the PDM drive system. To finish the hole section, the operator had to select another alternate BHA, which was run in hole at 13,216-ft MD. It made a total of 1,834 ft to get to TD at 15,050-ft MD—with five drill bits required.
Because of the performance achieved with the Neyrfor turbodrill in this extended-reach trial, the operator drilled four more wells with the successful strategy, an effort that resulted in 57½ cumulative saved drilling days, cost savings of USD 1.4 million, and several record-setting wells: