Shell Saves USD 8.5 Million During Gulf of Mexico Salt Drilling Project | SLB

Shell saves USD 8.5 million during Gulf of Mexico salt drilling project

minus
Gulf of Mexico, United States, North America, Offshore

SLB outperformed previous benchmarks in salt drilling while maximizing penetration rates and reducing operating costs. We used PowerDrive Orbit™ RSS to maintain directional control at increased rpm. We incorporated the AxeBlade™ ridged diamond element bit for lower reactive torque and higher ROP.

Improve drilling speed and efficiency in salt drilling

Shell wanted to design an optimized drilling system and identify best practices that would set a new standard for Gulf of Mexico salt drilling. This required a joint effort between Shell and SLB to identify best practices.

Use an optimized BHA design to achieve footage and ROP increases

SLB drilled salt intervals with a record-breaking net ROP of 311 ft/h, beating the operator's worldwide benchmarks and saved USD 8.5 million compared with the expected well plan.

Based on the analysis, a "drill on torque" approach was recommended to maximize ROP in the salt. This would require increasing the torque limit to 65,000 ft.lbf while drilling salt. Consequently, it was suggested that the salt drilling BHAs be designed with higher torsional stiffness to enable higher torque and rpm without inducing harmful vibrations.

For the 16 1/2-in build-and-hold section, a combination of the PowerDrive Orbit RSS from SLB and the AxeBlade bit from SLB was recommended to enhance the drilling performance and to widen the operating envelope, as compared with conventional PDC bits and RSS systems.

Achieved new salt drilling benchmarks

The 18 1/8-in × 21-in section was drilled at 200 rpm with 65,000-lbf surface WOB, resulting in 200-ft/h [61-m/h] net ROP, and a maximum instantaneous ROP of 300 ft/h [91 m/h]. This represents a 20% increase in ROP, as compared with the best offset of 160 ft/h [49 m/h].

Drilling performance on the 16 1/2-in salt section outperformed the historical benchmark of 275 ft/h [84 m/h] by achieving a 311-ft/h [95-m/h] net ROP, while building from vertical to 42° inclination. A maximum instantaneous ROP of 479 ft/h [146 m/h] was achieved during the run. The operation drilled 5,353 ft [1,632 m] in a 24-hour period and the entire 13,674-ft [4,168-m] interval was drilled in a single run. ROP increased by 20% and 13% for the 18 1/8-in × 21-in and 16 1/2-in sections, respectively, as compared with the best offset well. This resulted in a savings of USD 8.5 million under the AFE for the 16 1/2-in TD.

Graph: Shell Saves USD 8.5 Million During Gulf of Mexico Salt Drilling Project - Optimized BHA incorporates PowerDrive Orbit RSS with AxeBlade bit to achieve 311-ft/h net ROP in salt interval
The SonicScope multipole sonic-while-drilling service.