Prepare your well for production with efficient postfracturing services designed to manage frac fluid flowback and well cleanup.
An operator in the Marcellus Shale in Appalachia, USA, was encountering heavy returns of salt and sand during well flowback and cleanup, forcing multiple well shut-ins. Cameron has extensive experience in flowback and well testing while minimizing NPT and maintaining equipment integrity. The operator approached Cameron for a solution.
To ensure superior performance, Cameron tailors flowback and testing products and services to specific applications. The workforce management system matches technician skill sets to operator needs. Field technicians complete stringent HSE courses and training on all flowback and well testing equipment.
In addition, Cameron provides piping and instrumentation diagrams (P&IDs) for its equipment and systems at the wellsite. These diagrams show the relationship between each piece of equipment, facilitating development of flow diagrams and troubleshooting.
After installing flowback and testing equipment, Cameron personnel monitored it closely and emptied sand traps every 10 minutes when necessary, even during the night. The team also used the belly dump on test separators to prevent any fluid from carrying over into the flare scrubber. These quick responses saved three wells from being shut in. Since 2010, Cameron has performed multiple flowback jobs for this operator with zero spills.