El diagnóstico del perfil mantiene la productividad y evita un tratamiento costoso de control de agua | SLB

El diagnóstico del perfil mantiene la productividad y evita un tratamiento costoso de control de agua

Published: 12/15/2011

Blue hero texture

Production-profile diagnosis and water-cut assessment

PEMEX sought diagnostics and a solution to decrease water cut in its Shishito 11 well—the best oil producer in the Shishito field. The water cut had increased from 20% to 40% in a six-month period. Initially, PEMEX attempted to determine the water entry points and possibly define a water-conformance treatment by running a production log on cable. However, the log was dependent on the production log tools' ability to reach beneath the cable under gravity conveyance. Subsequently, it was not possible to run a log in the horizontal section of the well or obtain a production profile of the producing zones.

Real-time measurements with coiled tubing and production logging

The operator partnered with Schlumberger, the recognized leader in production logging in southern Mexico, to assist with the special needs of this production logging. The operator was specifically impressed with the ACTive PS integrated coiled tubing service and Flow Scanner logging system.

The ACTive PS service uses fiber-optic telemetry and downhole wireline data conversion to run real-time tools conventionally conveyed on wireline. Running the ACTive PS service and Flow Scanner system together would enable PEMEX to gather valuable information about the lateral section—in real time without killing the well. Schlumberger ran the toolstring inside a horizontal, expandable-screen completion that had not been entered since its installation four years earlier.

Substantial cost savings while maintaining production level

The high-quality, real-time data revealed water sources in various sections of the well, including the hydrocarbon-producing sections. Based on information from the ACTive PS operation, PEMEX decided not to perform any water conformance intervention in the short term. Water conformance treatments can reduce permeability in water-producing zones and decrease the overall productivity of the well. This helped PEMEX avoid the expenses and risks of a water conformance treatment. PEMEX continued to produce the well in its present state, maintaining hydrocarbon production.

Coiled tubing crew reviewing operational procedures.
Coiled tubing crew reviewing operational procedures.
Location
Mexico, North America, Onshore
Details

Desafío: Efectuar por primera vez una entrada para registrar el pozo hasta la profundidad total, dentro del tramo horizontal, con el fin de determinar las entradas de agua y posiblemente definir el tratamiento de control de producción de agua

Solución: Desplegar los servicios integrados de producción con tubería flexible ACTive PS y el sistema de adquisición de registros de producción en pozos horizontales y desviados Flow Scanner para determinar las características de flujo multifásico del pozo

Resultados Se adquirieron datos de calidad en tiempo real, que demostraron la presencia de varias fuentes de agua, incluidas secciones de pozo productoras de hidrocarburos. Esta información ayudó a PEMEX a evitar la ejecución de un tratamiento costoso de control de agua, a la vez que redujo los aspectos logísticos y la huella ambiental

Products Used