Understand geomechanical risks and optimize production
Published: 09/21/2010
Published: 09/21/2010
Because of the considerable facilities costs for steam-injecting and producing a well, an operator needed to understand and mitigate the risk of potential future uplift caused by the steam injection. An uplift event in this Middle Eastern heavy oil well could necessitate expensive remedial works to one or several facilities.
To fully comprehend the surface movement risk, the operator chose to perform a fieldwide geomechanics analysis. The company opted to work with Schlumberger Petrotechnical Services (PTS) because of previous successes with 2D geomechanical studies using the VISAGE stress simulator and its ability to include complex geological structures and perform 4D coupled modeling.
With the expertise of the Reservoir Geomechanics Center of Excellence in Bracknell, UK, the PTS team conducted a one-way coupled modeling workflow using the VISAGE software.
This process included
By matching the 1D preproduction stress state and the historical surface movement data, as well as forecasting microseismic events, the Bracknell team predicted a range of field behaviors accurately. The team also predicted EOR-induced movements over the next 25 years, which showed differential-induced deformations directly beneath the field's main facilities.
The 4D geomechanical modeling of the preproduction state provided the operator with a better understanding of the induced surface movements and the potential for fault reactivation. Armed with this information, the company was able to optimize the reservoir surveillance and management systems to minimize the risk to the facilities.
Challenge: Understand and mitigate risk of surface movements during EOR operations.
Solution: Perform 4D geomechanical modeling to calculate the preproduction effective stress state using VISAGE reservoir geomechanics modeling software.
Results: Developed optimal injection and production schedules based on modeling findings, thereby helping to protect surface facilities investment.