Using Schematics for Managing Well Barriers | SLB

Using Schematics for Managing Well Barriers

Published: 09/17/2015

Concrete blue texture

Well integrity and well barriers have been part of the exploitation for oil and gas for nearly a century, with the introduction of the blowout preventer (BOP) in the 1920s. The concept of creating well barrier schematics was inaugurated in Norway in 1992, long before the accidents on the Montara platform in 2009 and the Deepwater Horizon rig in 2010 elevated the global focus on well integrity.

Download the PDF to read the full JPT article.

Byline
Tore Fjågesund, SPE, Wellbarrier
Publication
Journal of Petroleum Technology
Article Topics
Software
Products Used