Khalda Petroleum Company Sets Directional Run Record with Ridged Diamond Element Bit | SLB

Khalda Petroleum Company Sets Directional Run Record with Ridged Diamond Element Bit

Published: 09/28/2020

Concrete blue texture
Pairing an AxeBlade bit with a PowerDrive RSS, Khalda Petroleum Company drilled 3,277 ft in 80.6 h at an ROP of 40.7 ft/h in a J-shaped well profile. The run increased ROP by 41% compared with the best field offset and set a record for the fastest and longest directional run in the field, saving USD 65,000.
Pairing an AxeBlade bit with a PowerDrive RSS, Khalda Petroleum Company drilled 3,277 ft in 80.6 h at an ROP of 40.7 ft/h in a J-shaped well profile. The run increased ROP by 41% compared with the best field offset and set a record for the fastest and longest directional run in the field, saving USD 65,000.
Location
Egypt, Africa, Onshore
Details

Operator
Khalda Petroleum Company

Hole size
8 1/2 in

Well profile
Deviated

Background

Khalda Petroleum Company wanted to drill 3,000 ft or more in a deviated well and improve ROP compared with direct offsets in Egypt.

Products Used