ENI ZFOD and Schlumberger Achieve 42% Increase in Drilling Performance, Iraq | SLB

ENI ZFOD and Schlumberger Achieve 42% Increase in Drilling Performance, Iraq

Published: 04/19/2018

Concrete blue texture
Schlumberger Integrated Drilling Services combined technologies, workflows, and integration capabilities with ENI ZFOD strengths to improve overall drilling performance by 42% as measured in feet drilled per day. Rig move times decreased by 34%, and service quality improved with a substantial reduction of 36% in NPTr.
Schlumberger Integrated Drilling Services combined technologies, workflows, and integration capabilities with ENI ZFOD strengths to improve overall drilling performance by 42% as measured in feet drilled per day. Rig move times decreased by 34%, and service quality improved with a substantial reduction of 36% in NPTr.
Location
Iraq, Asia
Details

Zubair Field, Iraq

Background
The Zubair field in southern Iraq is one of the largest oil fields in the world. ENI ZFOD worked with multiple service vendors for previous drilling campaigns, yielding limited results as measured by feet drilled per day, which was 174 ft/d [53 m/d] and well below the AFE 227 ft/d [69.18 m/d]. Rig move times lagged and overall NPT added to poor efficiency ratings. Consequently, ENI ZFOD held detailed discussions with Schlumberger to establish project goals and assess the complementary capabilities of the two companies. This collaboration enabled the implementation of fit-for-purpose processes and technologies.
Products Used
Subscribe