ABRASIJET and ACTive Services Save Operator USD 1.4 Million and Reduce Risk | SLB

ABRASIJET and ACTive Services Save Operator USD 1.4 Million and Reduce Risk

Published: 07/10/2015

Concrete blue texture
 
Graph: ABRASIJET and ACTive Services Save Operator USD 1.4 Million and Reduce Risk
The ABRASIJET service was completed in only 26 days compared with the conventional method which would have taken 38 days. Combining ACTive and ABRASIJET services have increased operational efficiency by up to 25% and reduce time by 31.6%.
Location
Angola, Africa
Details

Republic of Angola
Offshore Field

Lithology
Carbonate cemented with sand
 
Well depth
12,400-ft MD [3,778-m MD]; 12,280-ft TVD [3,743-m TVD]
 
Pressure
5,036 psi [34.7 MPa]
 
Temperature
300 degF [149 degC]
 
Completion size
3½-in cemented monobore
 
Water depth
223 ft [68 m]
 
CT size
1¾ in [2.54 cm]

Background
An operator had traditionally run wireline perforating to achieve the depth accuracy required for their fracturing operations. Because CT is used to clean out the oil and gas producer after fracturing, a significant amount of time was needed to rig down and rig up surface control equipment, which resulted in additional costs and HSE risk. The ABRASIJET* hydraulic pipe-cutting and perforating service was used on a small offshore platform to perform the perforations and limit the requirement of swapping services and equipment.
Products Used