Drill both the curve and lateral sections in a faster single run with the NeoSteer CL system.
Published: 03/25/2022
Published: 03/25/2022
Watch how Pluspetrol drilled a well's curve and lateral in a single trip, improving operational efficiency with less rig time and reducing CO2 emissions. Our customer used NeoSteer CL at-bit steerable system (ABSS) to eliminate a trip and successfully drilled 2,621 m in <83 hours.
NeoSteer CL ABSS is part of our portfolio of footprint-reduction technologies that includes solutions to help minimize well construction CO2 footprint. These technologies quantifiably reduce energy consumption and emissions, helping our customers achieve their sustainability goals while driving high performance.
Learn more on how to minimize well construction CO2 footprint