Epilogue Dual-String Barrier Evaluation | SLB

Epilogue Dual-String Barrier Evaluation

Published: 03/18/2022

Premium
Texture Rotating Blue

During the P&A well decommissioning phase, conventional through-tubing barrier evaluation operations require removal of inner pipe (casing or tubing) to evaluate the B-annulus and assess well integrity. This traditional approach to barrier or cement evaluation may take several days per well, depending on the operational complexity—increasing rig time and costs.

Watch this World Oil webcast to learn how Epilogue dual-string barrier evaluation eliminates the need to remove the inner pipe, enabling you to evaluate both the A- and B-annulus in a single run to reduce rig days, costs, and overall carbon footprint.

THIS ITEM IS PREMIUM CONTENT. TO ACCESS THE FULL CONTENT, SIGN IN OR REGISTER BELOW.
Sign in or register