Precisely control pressure in coiled tubing, drilling, completions, or any other critical operation.
Published: 08/19/2015
Published: 08/19/2015
The PFMS works by processing reservoir drill-in fluids (RDFs) from the well through two AUTOCHOKE units. Next, fluids pass through a mud/gas separator, where gases are transported to the flare line and the fluids move to a MONGOOSE PT shaker. Solids from the RDF are collected in containers and sent to auger cutting boxes. Then, the fluid moves to the fluid collection tank where it goes through a vacuum COMPACT D-GASSER and into another collection tank where the fluid is desilted before moving to another collection tank for recirculation.