视频 Automated Pressure Testing
Intelligent formation testing with PressureXpress service delivers fast, accurate formation pressures.
PressureXpress service delivers fast, accurate pressure and mobility measurements
The PressureXpress™ reservoir pressure-while-logging service brings new efficiency to formation pressure testing by significantly reducing both the time and risk involved with multifunction formation testers that also collect fluid samples. During the first logging run, PressureXpress service delivers real-time data in a fraction of the acquisition time. By focusing on pressure measurement, operations are reliable and efficient. Minimized setting and retracting times streamline survey cycles.
The dynamically controlled enhanced pretest system incorporated in PressureXpress service gives precise control of volume and drawdown rates. You’ll achieve drawdown and buildup profiles with greater precision than possible with conventional hydraulic technology.
PressureXpress service reduces the pressure testing process to less than a minute in most cases—quickly generating a reservoir pressure survey for connectivity analysis, a pressure gradient for fluid density and fluid contact information, and mobility and permeability data to aid in sampling-point selection.
Accelerate pretest data acquisition with a simplified and intelligent workflow that predicts pressure test validity in real time. Our pretest workflows use local conditions to deliver formation pressures faster—and with more assurance.
Data from PressureXpress service are the basis for accurate pressure profiles and mobility measurements that you can integrate with petrophysical, seismic, and conventional log data for a more complete reservoir picture.
Redefine what’s possible in cement evaluation with connected, intelligent system-level optimization.
Simulate various job scenarios and optimize programs to achieve your data acquisition objectives confidently.
Streamline communications and collaborate on integrated, up-to-date data with multidomain experts in real time.
Accelerate data processing and interpretation at the wellsite. Contextualize and turn insights into
real-time decisions.
Often, the clear picture from wellbore data only appears once processed data are put into context. Sometimes you don’t know if you met your data-acquisition objectives until after the window of opportunity has passed. Other times, you may be waiting on an answer to plan your next operational steps. Wellbore Insights on Delfi™ provides advanced interpretation and contextualization of data in real time, so you can make better, faster decisions. Interpretation workflows that took days are now completed in hours.
The slim OD and profile of PressureXpress pressure-while-logging service greatly reduce the risk of sticking. The eccentered tool shape, combined with a slight overbalance in setting force by the backup anchoring pistons, ensures an integral 1/2-in standoff from the formation during pretesting.
The smooth exterior profile also minimizes mudcake scraping during conveyance of PressureXpress service. There are no external tool angles over 20°.
The extensive qualification process for PressureXpress and PressureXpress-HT™ high-temperature reservoir pressure service was conducted at a system level for the entire tool, as well as testing of individual components and subassemblies. The mission profile is reliable tool operations under the full operational and environmental load, including temperatures up to 300 degF and 450 degF, respectively. The HT dual-flask design protects the electronic components from high temperatures, providing superior thermal stability and enabling an extended holding time of 14 h at 450 degF.