行业文章 MPD Reduces Rig Operating Days in the Bakken
Petro-Hunt increased drilling efficiency for long laterals using an integrated alternative drilling technique.
Engineered configurations for all pressure-sensitive applications
With our all-inclusive suite of customized manifolds, M-I SWACO can design application-specific configurations of chokes, gate valves, fittings, and technical specifications to give you precise pressure and flow control in any operation requiring a choke to control surface casing pressure, including managed pressure drilling (MPD) and underbalanced drilling (UBD).