Losseal Max
Lost circulation control treatment
Lost circulation control treatment to bridge and plug large fractures to reduce fluids lost to the formation.
The Losseal Reservoir Fracture™ lost circulation control treatment is a composite blend of dissolvable fibers and solids designed to effectively control lost circulation during drilling. The Losseal Reservoir Fracture treatment remains stable across a wide bottomhole temperature range and reliably plugs fractures of varying widths. The material lasts long enough to complete the well, then gradually degrades, leaving the formation undamaged and enabling natural fracture production without remedial intervention.
Plugging material degrades with time to enable production from the zone
Fiber durability options offer adjustable plugging periods according to operational need
Treatment can be pumped through some BHAs and drill bits