Control oil, gas, and fluid flow with a downhole choke, easily recovered and reset without pulling the plug
The top-latch choke of Peak Family™ flow control and well intervention tools is designed to be installed within a SIMstandard™ or SIMplus™ retrievable bridge plug, creating a downhole choke that enables the plug to choke back well fluids as desired.
SIM™ sealing integrity management system plugs have a unique feature in which the top-latch choke can be deployed and recovered to the surface without recovering the plug body. This means the choke can be recovered and resized to meet flow requirements without the added runs required to pull and reset a plug—reducing additional interventions, operating time, and plug redress costs.