A cloud-based system providing prompt notification of local seismic events that affect regulatory compliance.
A custom-designed solution provided real-time monitoring of seismicity, enabling continuous operation of a gas storage site while protecting the local population and fulfilling government regulations. The system helped the operator correlate potential microseismic activity with gas storage operations and mitigate potential risk in a timely manner.
An independent operator in the field of gas storage services was operating a large underground storage facility in northern Italy and needed to monitor the site for induced seismicity potentially caused by injection and extraction activities. The gas was stored in a series of methane-depleted, anticlinal reservoirs of Pliocene sandstone with local caprock consisting of Lower Pleistocene claystone.
With such an operation, it becomes important to carefully monitor seismicity in the caprock and at lower depths to ensure reservoir integrity. High-resolution monitoring helps to precisely locate such events, especially on the depth scale.
The operator’s main objective was to protect the security of the gas supply and comply with all applicable government regulations. Continuous, focused monitoring and surveillance would affirm the company's commitment to protect the environment and the local population from any potential leak events.
The custom-designed solution now provides monitoring and continuous supervision for the company’s daily operations, enabling continued operation of the gas storage site while protecting the interests of the local community. For this project, SFP can detect in real time any local or regional seismic event.
When anomalous events are detected, email notifications are transmitted to SLB experts who analyze and verify the events, enabling the operator to correlate potential seismic activity at a microseismic level with the injection and extraction rates and mitigate potential risk in a timely manner. The implemented solution has been in continuous operation since November 2018.