Asia Pacific, 陆上

An integrated coiled tubing (CT) strategy enabled liquid unloading and scale removal from five geothermal wells, kickstarting or enhancing production and eliminating the need to drill makeup wells. The successful operation established the effectiveness of rigless interventions with CT for increasing geothermal power generation despite challenging well geometries and extreme temperatures >500 degF [>260 degC].

Photo shows CT rigged up at a geothermal site will clouds of steam all around.
Collaboratively planned CT interventions revived geothermal wells without the need to wait on rig availability.