While trying to develop Tuha Basin gas reserves in China’s Xinjiang Province, the China National Petroleum Corporation (CNPC) was experiencing deviation tendencies while drilling 8 1/2-in vertical hole sections through the difficult J2x formation. The challenge in this area for operators is to maintain verticality from 2,400 m to 3,500 m while drilling through interbedded sandy claystone and coal layers that have a building tendency away from the planned well path. Operators are often forced to make several costly correction runs before starting the horizontal production hole in the reservoir. In an attempt to address the verticality issue and develop a cost-effective downhole tool system to maintain the desired wellbore trajectory, engineers experimented with a variety of BHAs:
Most recently, wells KE28 and KE33 required between five and six bit trips to complete an 8 1/2-in hole section at the unacceptably low average ROP of 1.6 m/h and 2.4 m/h. To complete hole sections with the fewest bits possible, and thereby reduce field development costs, CNPC sought a BHA configuration and PDC bit that would enable them to maintain verticality while increasing ROP.
To help CNPC meet their drilling performance goal, Schlumberger formed an engineering team composed of a vertical drilling system and PDC bit design experts. The team used the DBOS drillbit optimization system to analyze rock strength and the IDEAS platform to analyze different PDC cutting structures to determine the blade count and shearing configuration that would produce the most dynamically stable drilling. Based on the team's analysis and offset well data, an 8 1/2-in Mi616LMHBPX PDC bit was identified as the best candidate to accomplish the operator-driven ROP objectives.
To mitigate deviation tendencies, engineers selected the PowerV vertical drilling RSS, which can be run with minimal rigsite supervision using the primary rig drive system or a positive displacement motor for rotation. The PowerV RSS automatically maintains well verticality and can be deployed during normal drilling operations, including backreaming and shoe drillout. The PowerV RSS significantly reduces the need for costly correction runs.
The 8 1/2-in Mi616 PDC bit was run in combination with PowerV RSS on KE282 with outstanding results. The drilling system drilled the entire 740-m hole section at 7.1 m/h through the difficult J2x formation in a single run, setting a new field benchmark. The IDEAS platform–optimized PDC drill bit increased ROP by 250%, eliminating four trips for bit changeout. The performance improvement saved CNPC more than 14 days of rig time and bit costs for a total savings of USD 93,000.
Challenge: Efficiently drill an 8 1/2-in high-quality vertical borehole though difficult interbedded lithologies at an ROP greater than 2.4 m/h.
Solution: Apply DBOS drillbit optimization system and IDEAS integrated dynamic design and analysis platform to engineer a PDC bit for the application and capable of running with the PowerV vertical drilling rotary steerable system.
Results: The engineered BHA set a new Tuha field benchmark drilling the demanding J2x formation in a single run increased ROP by 250% and saved USD 93,000 in drilling costs.