Intervention Mill and Thru-Tubing Turbodrill Deployed to Restore Interval Access in Pakistan | SLB

Intervention Mill and Thru-Tubing Turbodrill Deployed to Restore Interval Access in Pakistan

已发表: 12/03/2015

Blue hero texture

Remedy blocked interval access under harsh downhole conditions

In Pakistan, an operator needed to reestablish access to the perforated interval on a gas-producing well. The operator had determined previously that production from the well was being hindered by the buildup of hard scale on the 4 1/2-in production liner, restricting access to the perforated interval.

Prior attempts to remove the scale with high-pressure jetting nozzles were unsuccessful. Due to conditions in the well, nitrified fluids were required to maintain returns during the millout job. The top of the scale buildup inside the liner was confirmed at an MD of 12,188 ft [3,715 m], and the bottomhole temperature was recorded at 266 degF.

Deploy i-MILL TT mill and turbodrill for consistent milling performance

To restore access to the perforated interval, Schlumberger suggested using the i-MILL TT mill, which was designed using the IDEAS integrated dynamic design and analysis platform to provide a force-balanced and fit-for-purpose cutting structure capable of efficiently removing hard scales and cement.

It was also recommended to use a Neyrfor TTT turbodrill for high downhole mechanical power output in harsh milling conditions. The turbodrill’s all-metallic design is ideal for applications where nitrified fluids are required, as was the case in this well.

Restored production with reestablished access to perforated interval

A 3 5/8-in-OD i-MILL TT mill powered by a 2 7/8-in Neyrfor TTT turbodrill was deployed on 2 3/8-in coiled tubing to remove scale from 12,188 ft to 12,398 ft [3,715 m to 3,779 m], pumping brine at 1.1 bbl/min and 2,000 ft3/min of nitrogen.

The high rotational speed of the turbodrill combined with the engineered cutting structure of the i-MILL TT mill enabled the operator to mill out the hard scale that had built up inside the production liner. The combination effectively cleaned 206 ft [63 m] of hard scale in a single trip with an average ROP of 0.7 ft/min.

Image - The i-MILL TT intervention mill provided superior milling performance in harsh downhole conditions.
地点
Pakistan, 亚洲, 陆上
Feature.PageContent.LeftRailDetails.Title

Challenge: Remove scale buildup to restore access to a perforated interval in a gas-producing well in Pakistan.

Solution: Run the i-MILL TT intervention mill powered by a Neyrfor TTT thru-tubing turbodrill to achieve the desired milling performance and remove hard scale.

Results: Milled 206 ft [63 m] of hard scale in a single trip with an average ROP of 0.7 ft/min.

相关产品
Subscribe