Challenge: Scale buildup and unexpected proppant flowback account for 73% of ESP failures.

Solution: Schlumberger designed a single stage treatment that integrates ScaleFRAC scale inhibitor service and PropNET hydraulic fracturing proppant flowback control technology.

Results: Uninterrupted production for more than 9 months after scale and proppant flowback solution.