The new generation in multiphase flow simulation to overcome fluid flow challenges and optimize production.
已发表: 08/14/2014
已发表: 08/14/2014
Venineft LLC, a joint venture of Rosneft and Sinopec, planned to test an exploration well offshore Sakhalin to acquire data for reservoir booking. Rig costs were high, and the drilling season was short due to harsh climatic and sea conditions offshore in the Okhotsk Sea. To successfully meet its test objectives, Venineft required a fast yet effective well test solution that would ensure collecting high-quality data for making field-development and future investment decisions. Eliminating NPT while enabling supported decision making was mandatory.
After comprehensive consultation with Venineft, Schlumberger designed a custom well test program that included a number of solution systems:
This new process was used to reevaluate previous reservoir and well test data, identify and narrow uncertainty, and optimize the job design to include equipment selection, PVT sampling and analysis, flow-regime modeling, and flow-duration estimation.
Using the updated well test design and processes, Venineft was able to test three zones of the exploration well quickly. Real-time collaboration between the customer and Schlumberger well test experts guided critical reservoir engineering decisions, which shortened the well test from an expected 20 days to 18 days with no NPT. Further, Venineft acquired higher-quality data than in any previous well tested in the field.
Challenge: Test three exploration zones in a high-flow-rate reservoir in harsh offshore conditions with limited operating window.
Solution: Develop a custom well test program using multiple real-time technologies designed to transmit well test data to remote locations, enable collaboration with reservoir experts, and ensure equipment reliability and efficiency.
Result: Gathered enough high-quality exploration data to complete three exploration well tests in 18 days, 2 days earlier than the expected 20-day duration.