Flow Assurance Criticalities and Challenges Management in Zohr Gas Field | SLB

Flow Assurance Criticalities and Challenges Management in Zohr Gas Field

已发表: 10/28/2021

Concrete blue texture
Flow assurance criticalities and challenges management in Zohr gas field

In this World Oil article, PETROBEL and Schlumberger discuss solutions to overcome flow assurance challenges in the large Zohr gas field, deepwater Egypt. For this project, an integrated multi-phase dynamic model was used to optimize operating procedures for initial well clean-up and ramp-up to production, before first gas, by testing start-up scenarios, given several well and reservoir uncertainties.

Download the PDF to read the full article.

地点
Egypt, Africa
背景
This article originally appeared in the October 2021 edition of World Oil.
Feature.PageContent.Byline.Title
Mohamed Salah Elsayed, Samir Zayed, Muhammad Karam Omar, Mohamed Ahmed Tolba, Petrobel; Mohamed Nagy Negm, Hatem Mohamed Darwish, Ola Amr Hussein, Schlumberger
Feature.PageContent.Publication.Title
World Oil
文章主题
软件 Flow Assurance
相关产品
Subscribe