Using Schematics for Managing Well Barriers | SLB

Using Schematics for Managing Well Barriers

已发表: 09/17/2015

Concrete blue texture

Well integrity and well barriers have been part of the exploitation for oil and gas for nearly a century, with the introduction of the blowout preventer (BOP) in the 1920s. The concept of creating well barrier schematics was inaugurated in Norway in 1992, long before the accidents on the Montara platform in 2009 and the Deepwater Horizon rig in 2010 elevated the global focus on well integrity.

Download the PDF to read the full JPT article.

Feature.PageContent.Byline.Title
Tore Fjågesund, SPE, Wellbarrier
Feature.PageContent.Publication.Title
Journal of Petroleum Technology
文章主题
软件
相关产品