Subsea ESPs Restart After Year-Long Shutdown, Saving CNOOC USD 500 Million | SLB

Subsea ESPs Restart After Year-Long Shutdown, Saving CNOOC USD 500 Million

已发表: 04/22/2014

Concrete blue texture
 
Graphic: Field map of subsea wellhead layout. Current production in the field is about 23,000 bbls per day of crude oil.
Field map of subsea wellhead layout. Current production in the field is about 23,000 bbls per day of crude oil.
地点
中国, 亚洲, 海上
Feature.PageContent.LeftRailDetails.Title
Eastern South China Sea
Liuhua LH 11-1 Field
 
Operator
CNOOC Limited
 
Water Depth
300 m
 
Application
Subsea production
 
背景
LH 11-1 field is considered to be the largest subsea ESP artificial lift operation in the world; 25 of its wells have been operating with Schlumberger ESPs. After topside and subsea infrastructures were severely damaged by typhoon Chan Chu, all ESP wells were restarted. Today, ESPs in the field have achieved up to 10 years of run life.