RapidTieBack Multilateral Junction Doubles Production in Yurkharovskoye Field Well | SLB

RapidTieBack Multilateral Junction Doubles Production in Yurkharovskoye Field Well

已发表: 07/08/2016

Concrete blue texture
 
Graphic: RapidTieBack Multilateral Junction Doubles Production in Yurkharovskoye Field Well  - Multilateral well successfully drilled through a window depth of 19,865 ft
To ensure downhole success, full setup and compatibility testing of the casing exit system and lateral junction was performed in a workshop prior to drilling. The window was milled with a 7-in TrackMaster whipstock system, which uses a unique design for efficient installation and removal. The addition of the lateral branch was completed without incident and increased the well’s production by 100%.
地点
Russia, Europe
Feature.PageContent.LeftRailDetails.Title

Russian Land
Yurkharovskoye Field

Field
Yurkharovskoye
 
Total depth (MD)
24,337 ft [7,418 m]
 
Window depth (MD)
19,865 ft [6,055 m]
 
Inclination at window depth
78°

背景
A Russian operator engaged Schlumberger to drill a lateral junction in a well in the Yurkharovskoye field through a window depth of 19,865 ft.
相关产品
Subscribe