Save rig time in high-rate deepwater and subsea production and injection wells with single-trip completions up to HPHT conditions.
已发表: 10/24/2014
已发表: 10/24/2014
The XHP-BB big-bore packer is designed to withstand high flow rates and harsh environments, including both HPHT and low-temperature subsea injection wells.
Bay of Bengal, Myanmar
Application
High-rate gas production
Well type
Offshore
Natural resource
Gas
Proven reserves
9.1 trillion ft ³/d, 260 km³/d]
Average depth
8,500 ft [2,590 m]
Max depth
15,400 ft [4,694 m]
An operator had encountered inconsistent production in an offshore high-rate-gas well and needed a more suitable completion design for the planned three wells.
For the production rate expected (up to 100 million ft ³/d per well), large-bore (7-in) tubing was required. This type of well also demanded a large-bore packer that would withstand the harsh downhole conditions. Because of the offshore environment, it was critical that the packer minimize rig-related and intervention time, costs, and risks.