PowerDrive Orbit RSS Saves Canadian Natural Resources 2 Drilling Days in 3,022-m Lateral Section | SLB

PowerDrive Orbit RSS Saves Canadian Natural Resources 2 Drilling Days in 3,022-m Lateral Section

已发表: 06/13/2019

Concrete blue texture
The PowerDrive Orbit RSS provided a curve with up to 7° dogleg severity (DLS). The entire lateral was drilled in a single run with with less equipment damage than anticipated. This single-run lateral set a record for wells in the area with an ROP of 27 m/h.
The PowerDrive Orbit RSS provided a curve with up to 7° dogleg severity (DLS). The entire lateral was drilled in a single run with with less equipment damage than anticipated. This single-run lateral set a record for wells in the area with an ROP of 27 m/h.
地点
Canada, North America, 陆上
Feature.PageContent.LeftRailDetails.Title

Western Canda
Montney Formation, Wembley Field

Operator
Canadian Natural Resources Limited

Mud
CaCl

TD
3,022 m

背景

Canadian Natural Resources needed to drill a 3,000-m lateral while staying within the pay zone, which meant withstanding the high shock and vibration of the Montney Formation. The well plan required real-time communication with the RSS throughout the 3,022-m lateral section. Canadian Natural Resource’s standard plan was to drill the lateral in two bit runs, while struggling with sliding, equipment challenges, and lower ROPs. A BHA incorporating the xBolt G2 service was chosen to use alongside a DynaForce motor, a PowerDrive Orbit RSS, and XPC connections.

相关产品