Improve ROP with high weight on bit and additional torque capacity.
已发表: 09/23/2016
已发表: 09/23/2016
Well name
Purple Hayes 1H
Hole size, in
8.5
Lateral depth, ft
18,752
TD, ft
27,048
Drilling time, h
157.71
ROP, ft/h
118.9
Bit condition (end of run)
Pristine (no wear)
Automated steering algorithm
Hold inclination and azimuth (HIA)
Eclipse Resources wanted to drill the longest 8.5-in one-run lateral in the Utica Shale without any service quality or HSE incidents, while at the same time keeping tortuosity as low as possible.