Accelerate well construction and optimize performance.
已发表: 07/22/2022
已发表: 07/22/2022
In the world’s first project to convert coal seam gas into liquefied natural gas, nine rigs drilled a total of 1,000 wells. Wells producing up to 9,000 bbl/d caused water-related environmental issues. Short operation cycles and frequent rig moves, along with private land drilling, presented challenges. To resolve this, the operator developed a structured, flexible logistics setup and devised HSE campaigns to develop crew competency. Rig-moving was streamlined and equipment resized to establish a lean approach.