Shift from balanced- to progressive-elliptical motion without suspending or shutting down operations.
已发表: 06/13/2019
已发表: 06/13/2019
Southern Mexico
An operator was challenged to reduce costs for lost drilling fluid, cuttings transportation, and waste disposal by minimizing the amount of drilling fluid lost on cuttings going over the shakers. M-I SWACO, a Schlumberger company, installed the SCREEN PULSE fluid and cuttings separator on three MONGOOSE PRO dynamic dual-motion shale shakers to achieve operator goals and also operational NPT and HSE risks associated with the traditional vertical dryer. The well was drilled in four sections to 1,890 ft [6,200 m] to a total drilling depth of 16,404 ft [5,000 m].