Complete wells with the wide range of tools that can be run on CT.
已发表: 05/20/2015
已发表: 05/20/2015
The new motor improved frac plug removal time by 55%, saving the operator 40 hours compared with previous milling operations using 2 7/8-in motors and 2-in CT string. The 3 1/8-in coiled tubing motor, part of the CoilTOOLS tools and solutions portfolio, helped the operator achieve significantly higher milling performance. This included:
Lithology
Shale
Reservoir
Eagle Ford
Bottomhole temperature
290 degF [143 degC]
Well depth
17,500 ft [5,334 m]
Completion size
5½ in
CT string size
23/8 in [60.3 mm]
An Eagle Ford operator needed to mill out 21 5 1/2-in composite bridge plugs to bring a well onto production.