102 Plugs Successfully Milled Using CT in 31 Days During 8-Well Milling Operation | SLB

102 Plugs Successfully Milled Using CT in 31 Days During 8-Well Milling Operation

已发表: 09/05/2014

Concrete blue texture
 
Photo: 102 Plugs Successfully Milled Using CT  in 31 Days During 8-Well Milling Operation - Combination of techniques helped run 417,000 ft [127,000 m] of  2.375-in CT on schedule with zero string damage and no time lost
The Copperhead plugs were milled out of eight wells with an average milling time of 40.7 min per plug and with zero damage to the CT.
地点
Canada, North America
Feature.PageContent.LeftRailDetails.Title

British Columbia, Canada
Horn River

Lithology
Shale
 
Reservoir
Otter Park
 
Temperature
266 degF [130 degC]
 
Pressure
4,714 psi [32.5 MPa]
 
Max. drilling depth
16,440 ft [5,011 m]
 
Completion size
5.5 in [139.7 mm]
 
CT string size
2.375 in [60.3 mm

背景
An operator in Horn River needed to mill out Copperhead* drillable bridge and flow-through frac plugs to bring eight wells onto production after a horizontal plug-and-perf completion. A combination of techniques were used to mill plugs quickly and efficiently, including producing the well prior to milling; mill by differential pressure rather than weight on bit; limit the use of vibration tools to lower plugs only; monitor return fluid viscosity to determine proper gel loading and ensure solids carrying efficiency. There was no damage to the CT string and no time lost.
相关产品
Subscribe