已发表: 05/23/2011
已发表: 05/23/2011
Reservoir performance is dependent upon system interaction between the completion hardware, the wellbore reservoir section and its connection to surface. A-priori condition used to design a robust completion solution are housing units capable of draining and collecting fluids along the entire completion length and simultaneously produce oil while delaying more mobile fluids. Therefore the completion design should focus on:
In Ecuador, an operator has completed several wells equipped with ICDs, in both consolidated and non-consolidated reservoirs and with variable rock and fluid properties including viscosities varying between 4 to 47 cP. This paper describe the combination of ICD design, geo-steerirng, calibration with real-time log data, installation procedures and fluid historical production results through time.